Distil it.
Dry it.
Keep it sterile.
A chemical site moves more heat than almost anything else. A column boils at the bottom and rejects heat at the top; a reactor exotherm runs alongside a jacket that needs 120 °C; a tablet dryer throws away warm, moist air. Most of that heat leaves at 30–90 °C while the process wants 80–150 °C. A HETAPRO heat pump closes the gap — and states the boundary honestly: above roughly 150 °C, and inside a validated autoclave, steam still has a job.
Set the column temperature. The series follows.
Choose the temperature your reboiler, dryer or clean loop actually holds — not the maximum on a datasheet — and the panel returns the matching series, a realistic COP at that lift, the heat source that can feed it, and whether a boiler still has a job. Drag the slider or use the arrow keys. Most chemical and pharmaceutical heat sits in the first four bands, from 30 °C to 110 °C. The scale runs to 150 °C because low-pressure steam is real — and because where it stops, a fired heater or a validated clean-steam system takes over.
Wet granules, tablets, API drying, CIP and wash water — 60 / 80 °C
Pharmaceutical drying is deliberately gentle: wet granules 60–80 °C, coated tablets lower, API often below 90 °C to protect actives. The exhaust is warm and moist, so a dehumidifying heat pump recovers its latent heat and shortens the cycle. CIP wash water and WFI preheat are steady water loops that can share the same machine through a buffer tank.
One site, four heat loads
A chemical or pharmaceutical site does not have one heat demand. It has a separation train that boils and condenses, a drying line that evaporates water or solvent, clean utilities that need hot water and steam, and a cooling system quietly rejecting the heat the first three need. On a continuous site these loads often run at the same time — which is exactly why the operating year, not the nameplate kW, is where the capital gets carried.
Separation
Reboilers 80–130 °C, vacuum columns 60–95 °C, evaporator effects 70–120 °C. The condenser at the top of the same column is the heat source for the bottom.
Drying & evaporation
Wet granules 60–80 °C, API and intermediates 50–110 °C, spray-dryer support. The exhaust is warm and moist, so its latent heat is worth recovering.
Clean utilities
CIP wash water 60–85 °C, WFI preheat 25–95 °C, humidification and cleanroom HVAC, low-pressure steam for non-product-contact duties.
Waste heat
Reactor cooling water 40–90 °C, condenser heat 35–60 °C, hot condensate and effluent 50–95 °C, chiller condenser 30–40 °C. It leaves the site today; it is the fuel.
Twenty-one unit operations, band by band
The selector above answers one question — what series does this temperature need. This index answers the other: which real chemical and pharmaceutical steps sit in each band, what form of heat they want, and which machine serves them. Filter by band, or read the whole list. Sterilising autoclaves appear here as a boundary, not as a heat-pump duty.
On the plant: the column is a heat engine
A distillation column boils at the bottom and condenses at the top. That is a heat pump in all but name — except most plants burn gas to make the reboiler heat and then spend cooling water to throw away the condenser heat. A mechanically driven heat pump closes that loop: take the 40–60 °C condenser heat, lift it to 95–130 °C, and put it back into the reboiler. The same logic applies to evaporators, dryers and reactor jackets.
Distillation and evaporation: match the condenser to the reboiler
The reboiler and condenser of one column sit 40–70 K apart. That is exactly the lift a cascade heat pump is built for, and it is why distillation is the most natural heat-pump integration in the chemical industry. Published projects now reach 150 °C and above: a 50 MW thermal unit at BASF's Ludwigshafen site supplies formic-acid steam from steam-cracker waste heat, while a pharmaceutical installation in Sweden uses a 500 kW heat pump to deliver steam at 10 bar.
Start with the boiling pair, not the machine
Map the condenser and reboiler of each column as a pair before you look at any datasheet. A vacuum column with a 35–55 °C condenser and an 80–95 °C reboiler is an excellent fit at COP 3.4–3.9. An atmospheric column needing 130 °C is a different case, with COP closer to 2.5 and a much tighter need for close source heat.
Know when MVR is the better tool
For a single-effect evaporator with a small boiling-point elevation, mechanical vapour recompression is often the cheapest route. Heat pumps and MVR are not rivals: the heat pump can preheat the feed, MVR compresses the vapour, and a boiler keeps a small trim duty. Ask for both options priced in the same study.
Drying and clean utilities: low temperature, high hygiene
Pharmaceutical drying is deliberately gentle — wet granules at 60–80 °C, coated tablets lower, API often below 90 °C to protect actives. The exhaust is warm and moist, so a dehumidifying heat pump recovers latent heat and shortens the cycle. CIP and WFI preheat are steady water loads that can share the same loop, and cleanroom HVAC is often the longest-running duty on the site.
| Duty | Temperature | What limits it | Heat form |
|---|---|---|---|
| Wet granulation (tablets) | 60–80 °C | Actives, binders and starch gelatinisation | Dehumidified hot air |
| Fluid-bed / coating | 50–80 °C | Product-bed uniformity and solvent limits | Dehumidified hot air |
| API / intermediates | 50–110 °C | Thermal and solvent stability | Hot air / hot water coil |
| Lyophiliser support | 30–60 °C | Shelf and condenser heat; vacuum is the process | Hot water |
| CIP / wash water | 60–85 °C | Cleaning validation, not temperature alone | Hot water |
| WFI preheat / hot loop | 25–95 °C | Loop temperature and sanitisation cycle | Hot water |
Clean steam and the validated boundary
This is the line that matters in pharma. A sterilising autoclave runs at 121 °C for 20 minutes or 134 °C for 5 minutes, with saturated steam, controlled air removal, defined steam quality and IQ/OQ/PQ records. It is a validated pressure vessel, not a heat-pump duty in the same sense as a reboiler. The heat pump's job is upstream: preheat boiler feedwater, carry the utility hot-water loop, and feed the clean-steam generator's primary side through a double tube-sheet exchanger. The clean side stays exactly as validated; refrigerant never comes near it.
Adjacent duties we also size
Solvent recovery
Distillation columns at 80–130 °C with condensers at 40–60 °C form one of the cleanest source-and-sink pairs on a chemical site. Ex-rated equipment and solvent-compatible materials are specified from the first conversation, not added later.
Biotech & fermentation
30–40 °C reactor jackets and 60–85 °C CIP loops, low-grade and continuous, often paired with chiller condenser heat. The clean utility boundary is straightforward because the heat never touches product.
Specialty chemicals
Batch reactors at 60–110 °C and hot effluent at 50–95 °C. A buffer tank turns a ninety-minute exotherm into an all-day heat source; without one the same site looks like a poor fit on paper.
Particle & tableting
50–85 °C dehumidified drying with tight humidity control, plus heat recovery from the dryer exhaust. The latent heat in that exhaust is usually larger than the sensible term.
Six series, matched to the process step
Chemical and pharmaceutical sites use the whole range, but the case is strongest between 30 °C and 110 °C, where the waste heat already exists. The cards outlined in red follow the temperature band currently selected in the selector above — change the slider and the recommendation changes with it.
Utility hot water, cleanroom HVAC and CIP loops where no water-side waste heat is available.
The site workhorse: reactor cooling water, distillation condensers and hot effluent become the source for the next loop.
Vacuum-column reboilers, solvent recovery and reaction jackets above 95 °C where no water-side source is available.
Low-pressure steam for reactors, kettles and evaporators where the plant already returns condensate.
Sites with no usable water-side source that still need 110–150 °C steam — warm exhaust or waste water is the source here.
Wet-granule, tablet and API drying: dehumidified hot air with inverter control, 30–85 °C.
Ten years of heat, priced on your operating year
Energy price alone does not decide a chemical or pharma project — capital, load, source temperature and operating hours do. A continuous plant at 7,000 hours and a batch line at 3,000 are entirely different investments at the same kW. Set seven numbers and the panel prices both options over ten years, including the capital the boiler option does not need.
All monetary outputs are in whatever currency you enter. This is a screening estimate, not a quotation — the exclusions are listed directly below.
Included: installed system cost and ten years of energy cost for both options at constant prices. Excluded, and all of it favours the heat pump: avoided boiler servicing, fuel delivery and storage, NOx permits, flue-gas treatment, carbon cost, and any industrial electrification grant or tax credit. Excluded, and this works against it: electrical supply upgrades, Ex-rated equipment in zoned areas, clean-steam heat exchangers and re-validation work, pipework reroutes, and downtime during tie-in. The three formulas are the same ones used on our textile, food, new-energy and agriculture pages: boiler heat cost = fuel ÷ efficiency, heat pump heat cost = electricity ÷ COP, break-even COP = electricity ÷ boiler heat cost.
Where a heat pump stops — and what to do instead
An application page without limits is a brochure. These are the five boundaries we hit most often in chemical and pharmaceutical projects, stated before you ask.
| Boundary | Why | Correct solution |
|---|---|---|
| Reactor jackets above 180–200 °C | High-temperature synthesis and cracking; cascade COP collapses and refrigerant choice narrows sharply | Hybrid: the heat pump preheats feed or jacket water, a fired heater supplies the top temperature |
| Validated autoclaves and clean steam at 121 / 134 °C | A pressure vessel with IQ/OQ/PQ records, steam-quality limits and air-removal validation; re-qualification is expensive | Keep the validated clean-steam generator; the heat pump preheats its feed and carries the utility loop |
| Direct-fired furnaces and cracked gas above 400 °C | No refrigerant cycle reaches this band; the equipment is a metallurgy problem | Other electrification routes for the furnace; the heat pump recovers lower-grade heat around it |
| ATEX / solvent Zone 1 areas | Electrical classification, refrigerant charge limits and ignition sources all have to be engineered | Ex-rated components, low-charge natural refrigerant where practical, indirect loop sited outside the zone |
| Fouling, polymerising or tar-laden streams | Evaporator and exchanger surfaces foul fast; downtime eats the saving | Indirect secondary loop, washable exchangers, or a cleaner waste-heat source |
Standards and compliance
Depending on where the machine lands — a solvent area, a utility room or a clean utility skid — a different set of rules applies. These are the ones that come up in project reviews.
Process and site safety
ATEX 2014/34/EU E IECEx for solvent and explosive atmospheres; PED 2014/68/EU E ASME VIII for pressure equipment; ASME B31.3 process piping; F-Gas 517/2014 and the Kigali low-GWP refrigerant phase-down; functional safety and SIL where the heat pump is tied into the plant safety system.
Pharma and clean utilities
EU GMP Annex 1 and cGMP; FDA 21 CFR Parts 210/211 E Part 11 data integrity; ISO 17665 moist-heat sterilisation and EN 285 steam sterilizers; ASME BPE hygienic design and double tube-sheet exchangers. The clean side is re-qualified only if its boundary changes — the heat pump is deliberately outside it.
What we need to size your system
No site visit is needed for a first-pass answer. Five pieces of information get you an indicative design, a COP range and a payback estimate.
Source and sink temperatures
Reboiler and condenser of each column, dryer inlet and exhaust, reactor cooling-water supply and return, CIP and WFI loop temperatures. Give us the pair, not just the peak.
Load and hours
Peak and average kW, the campaign calendar, batch duration and how many hours a year each loop is live. Batch plants live or die by this line.
Heat source quality
Flow and temperature of cooling water, condensate, hot effluent or condenser air — plus fouling, solvent content and corrosion risk.
Current cost of heat
Utility steam tariff or fuel price, boiler efficiency, electricity tariff including demand charges, and any carbon price or gas cost already in the budget.
Site constraints
Ex-rated zones, clean-utility boundaries, space for buffer tanks and heat exchangers, condensate return, and what re-validation would cost if the clean side were touched.
Q (kW) ≈ 1.163 × V (m³/h) × ΔT (K)
Example: 100 m³/h of reactor cooling water cooled from 55 °C to 35 °C → 1.163 × 100 × 20 ≈ 2,326 kW of heat already leaving the site — before condensate or hot effluent is counted. That is why the source survey comes before the machine selection.
Domande frequenti
Can a heat pump make process steam for a chemical plant?
What about the 121 °C autoclave and GMP clean steam?
Where does the waste heat come from on a batch plant?
Is it safe in a solvent or ATEX area?
How does a heat pump compare with mechanical vapour recompression?
What COP should I assume for a distillation reboiler?
Send us three numbers. Get a real answer.
Your reboiler and source temperatures, the hours they actually run, and what you pay for heat today. That is enough for an indicative COP, a recommended series and a payback range — with the GMP and ATEX boundaries stated, not hidden.
Sources and basis
- High-temperature heat pump potential in the 100–150 °C supply range for the food, paper and chemical/pharma industries — specifically drying, pasteurising, sterilising, evaporation and distillation: NetZeroCities, High Temperature Heat Pumps resource (netzerocities.app/resource-1458).
- Steam use below 200 °C across the chemical sector; commercial traction at 150–185 °C and pre-commercial status above 150 °C: PatSnap, Industrial Heat Pump High Temperature Process Technology Landscape 2026.
- Industrial heat shares of roughly 10 % below 100 °C and 26 % between 100 and 200 °C in Europe: German energy-agency studies as cited by Beyond Tomorrow, 2026.
- BASF Ludwigshafen 50 MW thermal heat pump, up to 500,000 tonnes of CO₂-free steam per year for formic acid, driven by steam-cracker waste heat through eleven compressors: Beyond Tomorrow, 2026.
- AstraZeneca Sweden / Olvondo Stirling-cycle heat pump producing 500 kW of steam at 10 bar: PatSnap landscape, 2026.
- Moist-heat sterilisation at 121 °C for 20 minutes or 134 °C for 5 minutes, saturated steam quality and validation to ISO 17665 / EN 285 / cGMP: pharmaceutical sterilisation references, 2024–2026.
- Wet-granulation temperature control at 40–60 °C and clean hot-air drying at 60–80 °C: published pharmaceutical process guidance, 2025.
- Heat-pump dryer specific moisture extraction rate of 1–2 kg/kWh: published heat-pump drying process data.